PSC Promulgates Proposed Final Rules re Wind Turbine Siting

The proposed Final Rules are available at the PSC website. At the time of this writing, there is a link on the home page to the final rules. If that link does not appear to be there when you visit the site, search on docket 1-AC-231. These rules have been sent to the legislature, and it will a month or two before we see if there are any amendments or if the legislature approves them as is. I’ll provide an update with more details as soon as they become available.

Related Attorneys